This metric indicates how much of the project is completed based on the total number of works assigned.

Formula
Project Completed % = (Actual Duration/Duration)X100
Project Completion % {{ TotalCompletedPercent | number: '1.2-2' }}
# Detail Value
1 Duration {{ SumofCurrentPlanHrs() }}
2 Actual Duration {{ SumofActualHrs() }}