Pre-Pouring Work Instructions
  1. 1.Verify all 8 cores are properly set in each mould box
  2. 2.Check mould hardness - should be minimum 85 on hardness tester
  3. 3.Ensure gating system is clear and undamaged
  4. 4.Check temperature every 10 boxes (Min: 1420°C, Max: 1480°C)
  5. 5.Pour at steady rate - approximately 15-20 seconds per box
Pouring Entry
refresh
Today's Pour Summary
Boxes Pouring 2
Pieces Produced 2
Metal Used 16
Serial Range 1441-1456